Tiffin Boys : timeline for 2-stage testing
Posted: Thu Oct 17, 2013 4:58 pm
Hello
unless I've misread the forum, looks like Tiffin Boys is two stage testing ?
What is the timeline of this ?
Results of initial test VR/NVR will be posted on 21-Oct, and 31-Oct CAF form gets closed...
Speaking logically, second stage test should happen after after 21-Oct but before 31-Oct.
Correct ?
unless I've misread the forum, looks like Tiffin Boys is two stage testing ?
What is the timeline of this ?
Results of initial test VR/NVR will be posted on 21-Oct, and 31-Oct CAF form gets closed...
Speaking logically, second stage test should happen after after 21-Oct but before 31-Oct.
Correct ?